Send us the pool quote you already have. We'll review it line by line, flag hidden markups and change-order risk, and tell you exactly where your money is going.
Inflated allowances, padded labor lines, and material markups that quietly add thousands over true cost.
Vague scope language, missing site-condition allowances, and trigger clauses that lead to mid-project upcharges.
Draw schedules that front-load risk, deposit terms, and contract language that leaves homeowners exposed.
Describe your existing pool quote, proposal, or contract. We will follow up to request a copy.
We compare each line to current true-cost vendor pricing in Tampa Bay.
You get a written summary highlighting overpriced lines, missing scope, and risk language.
Use the report to negotiate with your current builder, or ask for our cost-plus alternative. No pressure either way.
A pool proposal is a description of work with a price attached. Most of the value in a review comes from establishing what the proposal actually defines, because that determines both what you are buying and what can still change after you sign. We work through the same categories every time.
Waterline dimensions, depths, surface area, perimeter, spa configuration, steps and benches, and shell method. If the proposal describes a category rather than a specific pool, everything downstream is harder to price.
Tile, coping, decking, interior finish, and lighting are usually carried as allowances. We note the dollar figures and whether they are realistic for the selections you are actually considering.
What the proposal explicitly does not cover, and what you are expected to arrange or pay for separately. Common items include HOA submittals, fencing, irrigation repair, landscaping restoration, and utility relocation.
Manufacturer and model for the pump, filter, sanitation system, heater or heat pump, automation, and lighting. Equipment package names differ far more than they appear to.
Square footage, material, pattern, borders, drainage, and expansion joints, along with the specific interior finish product. Deck area is frequently the single largest variance between two proposals.
Whether engineered plans, permit preparation, permit fees, and any required survey are included, estimated, or excluded. Requirements vary by jurisdiction, so we look at how the proposal handles them rather than assuming.
Excavation access, protection, spoil handling, dewatering, unknown conditions such as rock or unstable soil, grading, drainage, and what the yard looks like on the final day.
Which parts of the proposal are most likely to generate a change order, how changes are priced and documented, and whether approvals require signatures before work proceeds.
How the price is built, deposit size, draw schedule, what triggers each payment, lien release documentation, and warranty coverage by component.
The most common question we hear is which proposal is less expensive. That question can only be answered once the proposals describe the same project. Suppose one proposal totals $120,000 and another totals $135,000. If the first has 500 square feet of decking, plaster interior finish, no heater, and excludes electrical, while the second has 900 square feet of decking, a quartz finish, a heat pump, and all electrical included, the totals are measuring different things. The lower number may cost more once the missing scope is added back.
So a review separates two questions. First, what does each proposal include? Second, given matched scope, how does the pricing compare? We can answer the first question thoroughly from the documents. The second becomes meaningful only after the first is resolved, and we are direct with you about which parts of a comparison the documents genuinely support.
To work through this yourself, use our line-by-line proposal comparison guide and the companion explainer on what is included in a pool construction quote. For typical category pricing in this market, see the Tampa Bay pool cost guide, and to model how an open-book structure compares against a fixed-price scenario with your own assumptions, try the cost-plus savings calculator.
The quote feels high but they can't tell which line items are inflated.
Their builder is vague about what triggers a change order.
The payment schedule asks for a large deposit before any work starts.
They want to know if cost-plus would actually be cheaper for their scope.
They've been burned by a previous builder and want a second set of eyes.
Want background on how we structure pricing? Read about cost-plus pool construction and protecting your pool investment.
Already have a pool construction proposal? Tell us about your project and the quote you received. Our team will follow up to request a copy of the proposal and review its scope, allowances, and pricing.